Project: ADVERTISEMENT FOR BIDS Bid Date, Time, & Location: (Public Opening) GFPS Safety & Security Winship Elementary Addition and Remodel 1412 5th Ave. N Grand Forks, ND 58203 Thursday, January 9, 2025 @ 2:00 PM CDT Construction Engineers ATTN: Jarrod Skoog 200 North 69th Street, Grand Forks, ND 58203 This project consists of a 630 SF addition and a 1,900 SF remodel of the existing administrative spaces. The project includes earthwork, utilities, site concrete, seeding, building concrete, structural steel, rough carpentry, architectural casework and countertops, air barriers, metal wall panels, roofing, firestopping, sealants, hollow metal and wood doors, aluminum storefront, glass and glazing, gypsum board assemblies, tile, flooring, acoustical ceilings, specialties, window treatments, mechanical, and electrical. Construction shall begin in April 2025 and will be completed in August 2025. Construction Engineers is soliciting competitive "Lump Sum Bids" for All Contract Categories. A Pre-bid Meeting will take place Monday December 30th, 2024 at 2:00 PM. Attendees will meet at the west entrance at door 1. This meeting is non-mandatory but suggested for all bidders. Bidding Documents Digital project bidding documents will be available for download on Thursday December 12th, 2024. Email TinaH@ConstructionEngineers.com for instructions on how to download a set of bid documents. Project : ADVERTISEMENT FOR BIDS Bid Date , Time , & Location : ( Public Opening ) GFPS Safety & Security Winship Elementary Addition and Remodel 1412 5th Ave. N Grand Forks , ND 58203 Thursday , January 9 , 2025 @ 2:00 PM CDT Construction Engineers ATTN : Jarrod Skoog 200 North 69th Street , Grand Forks , ND 58203 This project consists of a 630 SF addition and a 1,900 SF remodel of the existing administrative spaces . The project includes earthwork , utilities , site concrete , seeding , building concrete , structural steel , rough carpentry , architectural casework and countertops , air barriers , metal wall panels , roofing , firestopping , sealants , hollow metal and wood doors , aluminum storefront , glass and glazing , gypsum board assemblies , tile , flooring , acoustical ceilings , specialties , window treatments , mechanical , and electrical . Construction shall begin in April 2025 and will be completed in August 2025 . Construction Engineers is soliciting competitive " Lump Sum Bids " for All Contract Categories . A Pre - bid Meeting will take place Monday December 30th , 2024 at 2:00 PM . Attendees will meet at the west entrance at door 1. This meeting is non - mandatory but suggested for all bidders . Bidding Documents Digital project bidding documents will be available for download on Thursday December 12th , 2024. Email TinaH@ConstructionEngineers.com for instructions on how to download a set of bid documents .